Thorsys Australia Pty Ltd

Timeline

1998

  • Thorsys relocated its support office to Brisbane, Queensland.
  • In conjunction with Amcor Fibre Packaging, Thorsys developed and installed a carton order, forming and delivery system with realtime video and computer overlays.
  • Nolan Meats (Gympie, Queensland) issued a requirement for a full abattoir system (including livestock, specifications, stock, orders, slaughter, carton weighing, loadout, distribution) to which Thorsys tendered, and subsequently received the contract.
  • Thorsys contracts 2 people to IBM, on the Year 2000 Compliance testing at Optus and Telstra.
  • Thorsys developed a Livestock module integrated into the standard suite of programs.
  • Swan Hill abattoir (Victoria) issued a requirement for a full abattoir system (including livestock, specifications, stock, orders, slaughter, carcass loadout, distribution, skins and hides) to which Thorsys tendered, and subsequently received the contract.
  • Thorsys takes over all aspects of Ausmeat software, including Abcost, Abtag, Amis, existing customer sites, and copyright.
  • Q Meat issued a requirement for the replacement of their Beef and Smallstock lines at both Cannon Hill and Ipswich, to which Thorsys tendered, and subsequently received the contract.
  • Thorsys integrates into the Viascan suite of systems.

Return back to timelines listings

1991 - 2018 Copyright © Thorsys Australia All rights reserved.

Disclaimer